1 Rehabilitation of Water Supply System in Rajshahi City Md. Parvez Mamud
Phone: +88-0721-761639
Mobile: +88-01713-098863
Email: parvez_mamud@yahoo.com
Rajshahi WASA, Rajshahi. January 2016 - December 2018
  • Setting up the 80 k.m pipeline
  • Replacement of 22 nos generating tube-wells.
  • ICT related work and installation server.
  • Re-production of 40 nos tube-wells.
  • construction work of 1 store room.
2 Frees Water Project Phase – (ii) Md. Mahbubur Rahman
Phone: +88-0721-760068
Mobile: +88-01722-679235
Email: mahabub07ce@gmail.com
Rajshahi WASA, Rajshahi 25 April 2018 - 25 June 2018
  1. To Ensure drinking water for slum dwellers through supplying water by pipe line 450 m and 03 nos water point.
  2. To supply drinking water 24 hours for slum dwellers with minimum cost by installing water point
3 Frees Water Project Phase – (i) Md. Mahbubur Rahman
Phone: +88-0721-760068
Mobile: +88-01722-679235
Email: mahabub07ce@gmail.com
Rajshahi WASA, Rajshahi. 05 Oct 2017 - 30 Nov 2017
  1. To Ensure drinking water for slum dwellers through supplying water by pipe line 450 m and 03 nos water point.
  2. To supply drinking water 24 hours for slum dwellers with minimum cost by installing water point
4 Rehabilitation of Water Supply System in Rajshahi City Md. Sohel Rana
Phone: +88-0721-760154
Mobile: +880-1713-202306
Email: msrdon@gmail.com
Rajshahi WASA, Rajshahi. July 2020 - June 2023

To improve the human health & productivity & betterment of the living environment through the implementation of sustainable & effective maintenance of water supply service to as many people as possible.

5 Feasibility Study of Surface Water Treatment Plant for Rajshahi WASA Md. Parvez Mamud
Phone: +88-0721-761639
Mobile: +88-01713-098863
Email: parvez_mamud@yahoo.com
Rajshahi WASA, Rajshahi. November 2014 - October 2015

The main objective of the study is to conduct detailed feasibility study of Rajshahi water treatment plant & a full scale ESIA study for this project to finalize the most sustainable cost effective treatment plant considering all relevant technical, social, environmental, economic & institutional aspects

6 Land Acquisition for Surface Water Treatment Plant S.M. Tuhinur Alam (Deputy Secretary)
Phone: +88-0721-760638
Mobile: +88-01711-944650
Email: rajshahiwasa@gmail.com
Rajshahi WASA, Rajshahi July 2018 - June 2019
  1. To ensure customer satisfaction according to water demand up to 2035 through increasing population coverage by water supply from 71 % to 100 %, average daily consumption from 65 lpcd to 140 lpcd & improving water quality by producing 200 MLD potable water.
  2. To make the water supply system sustainable through improvement of water resource management by 100% water supply from surface water sources
7 Development of Water Supply System in Rajshahi City Md. Parvez Mamud
Phone: +88-0721-761639
Mobile: +88-01713-098863
Email: parvez_mamud@yahoo.com
Rajshahi WASA, Rajshahi. July 2012 - December 2015
  1. To Ensure customer satisfaction through increasing percentage of population coverage by water supply from 67 % to 87 %, average daily consumption from 65 lpcd to 100 lpcd & improving water quality.
  2. To make the water supply system sustainable through improvement of water resource management, financial management & human resource management by the decreasing operating ratio from 1.3 to 0.90, increasing collection efficiency from 54 % to 70 %, decreasing Non-revenue water from 38 % to 23 % & decreasing staff/1000 connection from 8.40 to 5.00.